Thursday, March 24, 2011

INTERNSHIP WEEK 7 at ABS-CBN

This week, we conducted a workload analysis/ survey/ interview for writers, editors and staff of abs-cbnnews.com. We finalized a presentation on Microsoft Excel regarding the functional requirements of NASReqstv 3.3, Maria Java, Basic CMS Customizations, CMS Feats, DMS, Karen and I also ran errands at ABS-CBN Foundation, Inc. (Bantay Kalikasan, BayanniJuan, Kapit Bisig para sa Ilog Pasig, Bantay Bata, E-Media, etc.).

Thursday, March 17, 2011

INTERNSHIP WEEK 6 at ABS-CBN

It was an ‘architecture’ week for the three of us because we were asked to sketch the floorplan of the office of News & Current Affairs Group (NCAG), NCAG HR, NCAG Engineering, NCAG Finance, Newsroom, Studios 6 and 7, and Media Assets. We finalized the floorplans on Paint and Microsoft Powerpoint for presentation. Sketching the workstations, somehow enhanced my creativity and drawing skills.

Friday, March 11, 2011

INTERNSHIP WEEK 5 at ABS-CBN

Finally, we were given a new assignment for this week aside from the never-ending tally of advisories we did with the past four weeks of our training. We were designated to conduct an inventory of computers used in the office of News & Current Affairs Group (NCAG), NCAG HR, NCAG Engineering, NCAG Finance, Newsroom, Studios 6 and 7, and Media Assets. We had to identify the computers whether it is generic LCD, generic CRT, assist or Mac. It turned out that most of the employees use generic computers. Only the editing rooms and heads’ offices often use assist/Mac PCs.

Friday, March 4, 2011

INTERNSHIP WEEK 4 at ABS-CBN

As for our additional work, I tallied the advisories for the month of February 21-28, 2010 then we included the results on the previous tallied and finalized outcome on Microsoft Excel. Because of the task, it taught me how to tally the results easier and more efficient. I also discovered other tools and operations on Microsoft Excel.